توضیح : چکیده این مقاله ترجمه نشده است.
Abstract
Power
quality (PQ) is a major concern in the relatively small island
electrical network of New Zealand. The potential influx of new
technologies, such as electric vehicles, heat-pumps, light-emitting
diode lighting, etc., could potentially cause
electromagnetic-compatibility problems in the future. To manage the PQ
into the future, a government-funded project entitled Power Quality (PQ)
in Future Electricity Networks (NZ) was instigated. This project was
co-funded by the Electricity Engineers' Association of NZ (EEA) and the
main deliverable was PQ guidelines that EEA members could adopt in
their grid connection codes. Other objectives were to influence device
standards and identify mitigation techniques. This paper gives an
overview of this project and presents some key findings
مقدمه
نیوزیلند (NZ) یکی از جالب ترین کشورها برای مطالعه کیفیت توان (PQ) و خصوصا هارمونیک
هاست، زیرا یک کشور جزیره ای کوچک می باشد که بخش بزرگی از برق تولید شده
آن، یکسوسازی را تجربه می کند. در حقیقت، تنها دو مورد از بارها (کوره
ذوب آلومینیوم Tiwai و لینک HVDC)، تا % 28 تولید پیک کشور را تشکیل می دهند. این مسأله منجر به مشکلات هارمونیکی
مستندی از اواسط دهه 1960 شده است. به علاوه، چالش عملکرد قابل اطمینان
کنترل ریپل (که در تمام نیوزیلند به کار می رود) در حضور سطوح اختلال پیش
زمینه ای همیشه وجود داشته است.
با بروز رسانی تجهیزات با استفاده از الکترونیک قدرت، تعداد فزاینده ای از بارهای صنعتی، غیر خطی شده اند و هارمونیک تولید می کنند. به علت اهمیت PQ و نگرانی درباره تأثیر احتمالی فن آوری های جدید (مانند استفاده گسترده از فتوولتائیک (PV) و خودروهای الکتریکی)، یک پروژه سه سال آغاز شد. این پروژه به طور مشترک توسط دولت NZ از طریق FRST و انجمن مهندسان برق (EEA) حمایت می شود.
این مقاله، مروری از این پروژه را که برای مدیریت سطوح PQ
در آینده و بخصوص با چالش های فن آوری های جدید طراحی شده است، ارائه می
کند. جزئیات چگونگی انجام این پروژه و دستاوردهای کلیدی آن ارائه شده اند.